Skip to content
Snippets Groups Projects

Draft: Updated wax and schemas to latest version to make possible hive submodule upgrade in clive

Open Bartek Wrona requested to merge bw_schema_wax_update into develop

Bug fixed


Issue [if exist]

resolves: #xx


How it was fixed?

Short description what was the cause and how it was fixed


Tests

Are tests were added to cover this in future or it needs to be added, if so how it should be tested?


Standard Checks

  • I checked is my fix works in other repos:
    • test-tools: link
    • hive: link
    • haf: link
    • hivemind: link
    • clive: link
  • I created proper MR in following repos:
    • test-tools: link
    • hive: link
    • haf: link
    • hivemind: link
    • clive: link
  • Tests are added or issue to make them is created [link]

Merge request reports

Merge request pipeline #105958 failed

Merge request pipeline failed for cd036a4a

Approval is optional
Merge blocked: 4 checks failed
Merge request must not be draft.
Pipeline must succeed.
Merge conflicts must be resolved.
Merge request must be rebased, because a fast-forward merge is not possible.

Merge details

  • The source branch is 20 commits behind the target branch.
  • 1 commit will be added to develop.
  • Source branch will be deleted.

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
Please register or sign in to reply
Loading